AERODROMES SANTA MARIA FIR

AERODROMES SANTA MARIA FIR
Pre-Flight Information Bulletin:
AERODROME
VALIDITY (UTC):
23 APR 2018 08:00 - 24 APR 2018 08:00
Id: LPPT1804230089
Profile: AD_LPPO_FIR_CONTINGENCY Schedule: Contingency_0800
Service Type: FULL
Date: 23 APR 2018 Time: 08:00 UTC Height Limits:
Lower: 000 Upper: 999
Flight Rules: IFR/VFR
Contents: Aerodromes, including miscellaneous information
Briefing Type: International,National
Aerodromes: LPAZ LPPD LPLA LPGR LPPI LPHR LPFL LPCR LPSJ
Legend:
+ NOTAM not older than 250 days
* Different from original
- Beginning of the message

LPAZ - SANTA MARIA

+
SANTA MARIA CMA MET SERVICE WILL BE CLOSED FM 0000 TO 0600 DUE TO 
SHORTAGE OF STAFF.
A1470/18
FROM: 26 MAR 2018 00:00 TO: 31 MAY 2018 06:00 EST
+
SANTA MARIA METEO CENTER CLOSED DUE TO STAFF SHORTAGE AS FOLLOWS:
14 1400-1800, 15 2000-2359, 18 2000-2359, 19 1400-1800, 20 2000-2359 
21 1400-1800, 22 1800-2359, 23 1200-1800, 24 0600-1200
A1813/18
FROM: 14 APR 2018 14:00 TO: 24 APR 2018 12:00 EST
+
DVORTAC VFL FREQ 112.700MHZ/CH74X. TACAN PART OUT OF SERVICE 
OPERATING DME MODE ONLY.
A1953/18
FROM: 19 APR 2018 12:09 TO: 18 MAY 2018 23:59
+
VOR/DME VMG FREQ 111.2MHZ/CANAL 49X OUT OF SERVICE.
A1971/18
FROM: 19 APR 2018 18:12 TO: 11 MAY 2018 18:00 EST
+
TWY C CLOSED DUE TO WIP. MEN AND EQUIPMENT UNDER TWR CONTROL AND 
AIRPORT AUTHORITY SUPERVISION. AIRCRAFT MOVEMENT WITH FOLLOW-ME 
GUIDANCE.
A2018/18
FROM: 22 APR 2018 10:54 TO: 22 MAY 2018 17:00 EST

LPPD - PONTA DELGADA

+
LPPO/LPPD (PONTA DELGADA) - OBSTACULO ERIGIDO. REF MVFR SUP 036/2017.
D0020/18
FROM: 15 JAN 2018 17:03 TO: 30 SEP 2018 23:59 EST
+
LPPO/LPPD (PONTA DELGADA) - OBSTACLE ERECTED. REF MVFR SUP 036/2017.
C0007/18
FROM: 15 JAN 2018 17:04 TO: 30 SEP 2018 23:59 EST
+
LPPO/LPPD (PONTA DELGADA) - OBSTACLE ERECTED. REF AIP SUP 047/2017.
A0181/18
FROM: 15 JAN 2018 17:05 TO: 30 SEP 2018 23:59 EST
+
REF AIP SUP 018/2018. SECTION 4 NEW TEXT: 4. TRIAL PROCEDURES - THE 
TRIAL RNP AR APCH PROCEDURES FOR RUNWAYS 12 AND 30 ARE DETAILED IN 
THE CHARTS ATTACHED TO THIS SUPPLEMENT, AND ARE AVAILABLE FOR USE, 
AT ATC DISCRETION BY THE AUTHORIZED OPERATORS. CREWS OF AUTHORIZED 
OPERATORS REQUESTING THE TRIAL APPROACH ARE TO ADVISE PONTA DELGADA 
APPROACH ON FIRST CALL.
A0414/18
FROM: 02 FEB 2018 00:00 TO: 02 AUG 2018 23:59 EST
+
DVORTAC VFL FREQ 112.700MHZ/CH74X. TACAN PART OUT OF SERVICE 
OPERATING DME MODE ONLY.
A1952/18
FROM: 19 APR 2018 12:08 TO: 18 MAY 2018 23:59
+
VOR/DME VMG FREQ 111.2MHZ/CANAL 49X OUT OF SERVICE.
A1969/18
FROM: 19 APR 2018 18:12 TO: 11 MAY 2018 18:00 EST

LPLA - LAJES

+
LAJES NDB GP FREQ 341 KHZ OUT OF SERVICE.
A1455/18
FROM: 23 MAR 2018 14:23 TO: 15 JUN 2018 17:00 EST
+
WIND INFORMATION AVAILABLE ON METAR REMARKS. 
TWO MINUTES AVERAGE WIND SPEED AND DIRECTION AND TEN MINUTES GUST 
AVAILABLE ON METAR REMARKS.
A1613/18
FROM: 05 APR 2018 11:01 TO: 04 JUL 2018 23:59
+
AERODROME WIP, FENCE REPLACEMENT, SOUTH OF THR RWY33. 
MEN AND EQUIPMENT UNDER TWR SUPERVISION.
A1955/18
FROM: 19 APR 2018 13:48 TO: 19 JUN 2018 18:00
SCHEDULE: MON-FRI 0900-1800

LPGR - GRACIOSA

+
ANEMOMETER RWY09 OUT OF SERVICE.
A1711/18
FROM: 10 APR 2018 19:29 TO: 04 MAY 2018 17:00 EST
+
ANEMOMETRO RWY09 FORA DE SERVICO.
D0336/18
FROM: 10 APR 2018 19:29 TO: 04 MAY 2018 17:00 EST

LPPI - PICO

+
RWY WIP.
REPAINTING WORKS OF RWY MARKINGS. MEN AND EQUIPMENT UNDER AFIS 
SUPERVISION.
WORKS WILL STOP AND EQUIPMENT WILL BE REMOVED FROM MOVEMENT AREA FOR 
ACFT OPERATIONS.
CREWS WILL BE ADVISED OF THE STATUS OF RWY MARKINGS BEFORE ARRIVAL.
A1460/18
FROM: 26 MAR 2018 09:00 TO: 04 MAY 2018 18:00 EST
+
RWY WIP.
TRABALHOS DE REPINTURA DAS MARCAS DA PISTA. HOMENS E EQUIPAMENTO SOB 
SUPERVISAO DO AFIS.
OS TRABALHOS SERAO PARADOS E O EQUIPAMENTO REMOVIDO DA AREA DE 
MOVIMENTO PARA A OPERACAO DE AERONAVES.
AS TRIPULACOES SERAO AVISADAS DO ESTATUTO DAS MARCAS DE PISTA ANTES 
DA ATERRAGEM.
D0273/18
FROM: 26 MAR 2018 09:00 TO: 04 MAY 2018 18:00 EST
+
RUNWAY THRESHOLD IDENT LIGHTS (FLASHING WHITE) RWY 09 OUT OF SERVICE.
A1968/18
FROM: 19 APR 2018 18:07 TO: 26 MAY 2018 18:00 EST
+
RWY THR LUZES DE IDENTIFICACAO (BRANCAS INTERMITENTES) RWY 09 FORA 
DE SERVICO.
D0365/18
FROM: 19 APR 2018 18:07 TO: 26 MAY 2018 18:00 EST

LPHR - HORTA

+
REF AIP SUP 017/2018. SECTION 4 NEW TEXT: 4. TRIAL PROCEDURES - THE 
TRIAL RNP AR APCH PROCEDURES FOR RUNWAYS 10 AND 28 ARE DETAILED IN 
THE CHARTS ATTACHED TO THIS SUPPLEMENT, AND ARE AVAILABLE FOR USE, 
AT ATC DISCRETION BY THE AUTHORIZED OPERATORS. CREWS OF AUTHORIZED 
OPERATORS REQUESTING THE TRIAL APPROACH ARE TO ADVISE HORTA APPROACH 
ON FIRST CALL.
A0412/18
FROM: 02 FEB 2018 00:00 TO: 02 AUG 2018 23:59 EST
+
DVORTAC VFL FREQ 112.700MHZ/CH74X. TACAN PART OUT OF SERVICE 
OPERATING DME MODE ONLY.
A1951/18
FROM: 19 APR 2018 12:07 TO: 18 MAY 2018 23:59
+
VOR/DME VMG FREQ 111.2MHZ/CANAL 49X OUT OF SERVICE.
A1970/18
FROM: 19 APR 2018 18:12 TO: 11 MAY 2018 18:00 EST

LPFL - FLORES

+
BACKTRACK OPERATIONS ARE FORBIDDEN. THESE OPERATIONS MUST 
BE DONE ONLY ON THE RWY TURN PADS LOCATED AT THE END OF EACH RWY. 
EXCEPTION MADE TO MEDICAL EVACUATION, SAR AND EMERGENCY FLIGHTS.
REF AIP LPFL AD 2.20.
A0156/18
FROM: 12 JAN 2018 17:05 TO: PERM
+
BACKTRACK OPERATIONS ARE FORBIDDEN. THESE OPERATIONS MUST 
BE DONE ONLY ON THE RWY TURN PADS LOCATED AT THE END OF EACH RWY. 
EXCEPTION MADE TO MEDICAL EVACUATION, SAR AND EMERGENCY FLIGHTS.
REF VFR MANUAL LPFL AD ITEM 11.
C0005/18
FROM: 12 JAN 2018 17:07 TO: PERM
+
OPERACOES DE BACKTRACK PROIBIDAS. ESTAS OPERACOES DEVEM SER 
EFECTUADAS SOMENTE NOS TURN PADS LOCALIZADOS NO FIM DE CADA PISTA. 
EXCEPTO PARA EVACUACOES MEDICAS, BUSCA E SALVAMENTO E VOOS DE 
EMERGENCIA.
REF MANUAL VFR LPFL AD ITEM 11.
D0018/18
FROM: 12 JAN 2018 17:10 TO: PERM
+
SUP 031/2017 LPFL AD MAJOR WORKS FOR RWY PAVEMENT IMPROVEMENT 
VALIDITY CHANGED. EXPECTED END DATE 30-APR-2018.
A1155/18
FROM: 09 MAR 2018 16:50 TO: 30 APR 2018 23:59 EST

LPCR - CORVO

No information received or matching the query

LPSJ - SAO JORGE

+
SAO JORGE MET SERVICE WILL BE PROVIDED ONLY TO SCHEDULE FLIGHTS AND 
ON REQUEST DUE TO SHORTAGE OF STAFF.
A1517/18
FROM: 28 MAR 2018 08:00 TO: 28 JUN 2018 08:00 EST
+
O SERVICO DE METEOROLOGIA DESTE AERODROMO SERA GARANTIDO APENAS PARA 
OS VOOS COM HORARIOS PROGRAMADOS E A PEDIDO, DEVIDO A REDUCAO 
TEMPORARIA DE PESSOAL.
D0294/18
FROM: 28 MAR 2018 08:00 TO: 28 JUN 2018 08:00 EST
END OF PIB
Briefing includes all NOTAM available. All Trigger NOTAM are valid only for two weeks. For the publication of ECAC States, please consult also the PAMS application.